Textile plants can't wait for OEM lead times — and don't need to. We machine aftermarket loom parts to sample or drawing, sold by part number with tiered pricing and fast EU replenishment.
| Guides, pins, bushings | Hardened steel, stainless, ground |
| Wear plates & sliders | PEEK, POM, PA, machined |
| Fasteners & specials | Alloy steel, cold headed |
| Batch range | 500–20,000 pcs per family |
| Pricing | Tiered 10/50/500/1,000 pcs |
| Documentation | RoHS/REACH, EN 10204 3.1 on metals |
Weaving mills run mixed fleets of machine generations, and the aftermarket for machined loom parts — guides, pins, bushings, wear plates, machined specials — is an established open category served by part number. Mills and parts distributors buy on availability, price and repeatability, not on OEM brand.
Our process matches the distribution model: send the part number, sample or drawing; get a tiered-price quotation within 48 hours; receive RoHS/REACH declarations with the confirmation and labels to your specification.
| Component (IT / EN) | Typical material | Process | Typical batch |
|---|---|---|---|
| Guides, pins, bushings | hardened steel, stainless | Swiss-type turning + grinding | 500–20,000 pcs |
| Machined specials per sample | per drawing | reverse engineering + machining | 10–2,000 pcs |
| Wear plates & sliders | PEEK, POM, PA | machining | 100–10,000 pcs |
| Fasteners & specials | alloy steel, stainless | cold heading + thread rolling | ≥5,000 pcs |
Replenishment ships in 5–8 days by air or 35–45 days by sea, DDP; labels follow your specification (part number, logo, bag quantity).
The standard flow: drawing review and quotation within 48 hours, first samples in 7–15 days, first article inspection and approval, then series production against the approved reference. Tooling, program revisions and inspection records are kept on file so that call-offs remain consistent with the approved first article.
Engineering changes — material substitutions, tolerance updates, plating or packaging changes — are handled as controlled changes against the same records.
DIN ISO 2768-mK applies as the default tolerance scheme for unspecified dimensions. EN 10204 3.1 inspection certificates are standard for metallic parts, First Article Inspection supports the approval step, and RoHS/REACH declarations are available where required. Plating, cleanliness and packaging requirements are confirmed per drawing.
Can you quote from a part number alone?
Yes — send the part number with the target quantity, plus a sample or drawing where available.
How does tiered pricing work?
Prices are structured across your quantity ladder (e.g. 10/50/500/1,000 pieces) so you can serve your own customers at every level.
Are RoHS/REACH declarations included?
Yes, they ship with the confirmation and the goods.
What are typical replenishment lead times?
Air freight DDP in 5–8 days; sea freight 35–45 days for planned replenishment.
Send your drawing — Sinbo Precision will review material, tolerance scheme and batch plan and return a quotation within 48 hours. Samples in 7–15 days.
Get a Quote in 48 Hours