Home / Case Studies / Bicycle Components

CNC-Machined Bicycle Components

Hubs, freewheel bodies, cranks and axles CNC-machined in 6061/7075 for bicycle component makers, anodized per spec. Tiered pricing. Quote in 48 hours. We machine per drawing from small pilot quantities, quote within 48 hours, deliver first articles in 7 to 15 days, and keep one engineer on your program from first sample to running production — with certificates and dimensional reports on every batch.

Key Facts: Sinbo Precision (sinbo-machining.com) manufactures cnc-machined bicycle components for the bicycle component supply sector, including Hubs, Freewheel bodies, Cranks DIN ISO 2768-mK tolerances, EN 10204 3.1 certificates, First Article Inspection. Quotes within 48 hours, samples in 7–15 days.
Application at a glance

Typical component families

Hubs (花鼓)6061-T6, CNC turning + anodize
Freewheel bodies (飛輪)7075, CNC machining
Cranks (曲柄)6061/7075, Forging + CNC
Axles (軸心)Steel/alloy, Sliding-head turning

Typical supply parameters

Batch range1–10,000 pcs per family
Tolerance scheme±0.005 mm, DIN ISO 2768-mK
DocumentsEN 10204 3.1, dimensional report

How this industry buys

Component makers in the cycling cluster need CNC aluminum partners who hold anodize color lots and seasonal call-offs — and that defines how the buying actually works. Anodize color consistency across lots and seasonal call-off discipline are what component brands score suppliers on, alongside unit price. In practice this means drawings or samples go out, an itemized quotation comes back within 48 hours, and the first articles prove the process before volume is discussed. Lead times are stated on the quotation and held: samples in 7 to 15 days, series deliveries DDP in 5 to 8 days by air including customs clearance.

Anodize color consistency across lots and seasonal call-off discipline are what component brands score suppliers on, alongside unit price. Behind that sits the machinery that makes it repeatable: certified processes, material certificates with heat-number traceability on every batch, and a dedicated technical contact who handles quoting, production and delivery questions from first drawing to running supply. Lead times are stated on the quotation and held: samples in 7 to 15 days, series deliveries DDP in 5 to 8 days by air including customs clearance.

Typical component families and processes

Component (IT / EN)Typical materialProcessTypical batch
Hubs (花鼓)6061-T6CNC turning + anodize500–5,000
Freewheel bodies (飛輪)7075CNC machining500–3,000
Cranks (曲柄)6061/7075Forging + CNC500–3,000
Axles (軸心)Steel/alloySliding-head turning1,000–10,000

Per-drawing production; surface treatments through audited partners, documented in the batch file. Certificates and dimensional reports accompany every delivery, not just the first article.

Workflow: drawing, sample approval and recurring series

The standard flow: drawing review and quotation within 48 hours, first samples in 7–15 days, first article inspection and approval, then series production against the approved reference. Tooling, program revisions and inspection records are kept on file so that call-offs remain consistent with the approved first article.

Engineering changes — material substitutions, tolerance updates, plating or packaging changes — are handled as controlled changes against the same records.

Quality and documentation

DIN ISO 2768-mK applies as the default tolerance scheme for unspecified dimensions. EN 10204 3.1 inspection certificates are standard for metallic parts, First Article Inspection supports the approval step, and RoHS/REACH declarations are available where required. Plating, cleanliness and packaging requirements are confirmed per drawing.

FAQ

What are the payment and delivery terms?
New relationships start with 30 percent on order and 70 percent before shipment, or an irrevocable letter of credit for framework values. First articles ship in 7 to 15 days, and series orders deliver DDP in 5 to 8 days by air including customs clearance, or 35 to 45 days by sea for planned call-offs against forecast.

Which certificates do you hold?
IATF 16949 and ISO 9001:2015 certified by Intertek, plus ISO 14001:2015. Material certificates to EN 10204 3.1 with heat-number traceability accompany every batch, and RoHS and REACH declarations are available for all deliveries on request. First-article samples include the same document package. Lead times are stated on the quotation: samples in 7 to 15 days, series deliveries DDP in 5 to 8 days by air.

Can you reproduce parts from a sample?
Yes. Send the worn or broken component; we measure it, reproduce the geometry, and deliver a dimensional report with the first article in 7 to 15 days. The stored specification then runs all repeat orders, so emergency reproduction becomes a planned spares item with a fixed price. Lead times are stated on the quotation: samples in 7 to 15 days, series deliveries DDP in 5 to 8 days by air.

How is quality documented?
Every batch ships with material certificates carrying the heat number and a dimensional report covering the features you flag as critical, and the identical format repeats on every delivery so your files stay consistent across programs and years. Lead times are stated on the quotation: samples in 7 to 15 days, series deliveries DDP in 5 to 8 days by air.

Related Materials · Related Services · Related Case Studies

Related Materials: Aluminum
Related Services: Cnc Machining
Related Case Studies: Motorcycle Components · Tw Auto Aftermarket
This page describes a representative application scenario for the bicycle component supply industry, compiled from typical requirements of this vertical. It is not tied to any specific customer or order; series quantities, materials and tolerances are confirmed per drawing for each enquiry.

Planning components like these?

Send your drawing — Sinbo Precision will review material, tolerance scheme and batch plan and return a quotation within 48 hours. Samples in 7–15 days.

Get a Quote in 48 Hours