Industrial manufacturers with full in-house shops still overflow: engineering changes, capacity spikes and the parts nobody wants to set up for. We machine turned and milled parts per drawing from 1 piece, quote within 48 hours with an itemized cost breakdown, deliver first articles in 7–15 days and keep the same engineer on your program from quote to production. Reverse engineering from a worn sample, itemized quotations and a single engineer from quote to production are the default, not the premium.
| Turned parts | Alloy steel, stainless, turned + ground |
| Milled parts | Aluminium, 316L, 3/4/5-axis |
| Spares & specials | Per drawing or sample |
| Batch range | 1–10,000 pcs |
| Tolerance scheme | ±0.005 mm, GD&T per drawing |
| Documents | Material traceability, dimensional report |
Every industrial program carries a tail of parts that are critical to the schedule but uneconomical to set up in-house: engineering change pieces, obsolete spares, brackets that appear late in the build. Local shops quote long lead times for them or decline entirely, and the project schedule absorbs the delay. The buyers who solve this keep a qualified overflow partner on file and send the drawing the same day. The buyers who solve this keep a qualified overflow partner on file and send the drawing the same day, because the delay is measured in assembly dates rather than in the price of the part itself.
We take those orders seriously at any quantity: quotes within 48 hours with an itemized cost breakdown, first articles in 7 to 15 days, and material certificates with heat-number traceability on every batch. Reverse engineering from a worn or undocumented sample is a standard route for spares, and DDP deliveries arrive in 5 to 8 days by air so the assembly date does not move because of one turned part. Repeat orders run against the stored specification with identical certificates and reports, so your files stay consistent across every call-off and every year.
| Component (IT / EN) | Typical material | Process | Typical batch |
|---|---|---|---|
| Turned parts | 4140, 303/304 | Turning + grinding | 1–10,000 |
| Milled parts | 6061, 316L | 3/4/5-axis milling | 10–2,000 |
| Spares from sample | Per sample | Reverse engineering + machining | 1–500 |
| Assemblies | Per drawing | Machining + outsourced treatment | 50–2,000 |
Itemized quotations and repeat-order specifications are stored per part number, ready for your audit at any time.
The standard flow: drawing review and quotation within 48 hours, first samples in 7–15 days, first article inspection and approval, then series production against the approved reference. Tooling, program revisions and inspection records are kept on file so that call-offs remain consistent with the approved first article.
Engineering changes — material substitutions, tolerance updates, plating or packaging changes — are handled as controlled changes against the same records.
DIN ISO 2768-mK applies as the default tolerance scheme for unspecified dimensions. EN 10204 3.1 inspection certificates are standard for metallic parts, First Article Inspection supports the approval step, and RoHS/REACH declarations are available where required. Plating, cleanliness and packaging requirements are confirmed per drawing.
What does an itemized quotation include?
Each quotation breaks out material, machining, outside treatment and packaging as separate lines, states the tariff schedule date it was priced against, and lists the lead time for samples and for series. The same structure repeats on every order, so your purchasing team can compare our quotes line by line with any other supplier without re-formatting anything. Samples ship in 7 to 15 days and DDP deliveries in 5 to 8 days by air, with the tariff schedule date printed on the quotation.
Can you reproduce a part that has no drawing?
Yes. Send the worn or broken part; we measure it, reproduce the geometry, and deliver a dimensional report with the first article. The specification is then stored against your part number, so emergency reproduction becomes a planned spares item with a fixed price and a repeat lead time you can build a maintenance schedule around. Reverse-engineered first articles typically take 7 to 15 days from sample receipt, and the dimensional report lists actual measured values on every critical fit.
How do you handle engineering changes?
Change requests are reviewed within 48 hours and answered with a delta quotation listing what changes, what stays and any tooling impact. On running parts the stored specification is updated only after your written approval, and the change revision is printed on every following certificate so the documentation trail stays clean.
What are the payment terms for a new supplier?
New relationships start with 50 percent on order and 50 percent before shipment, or an irrevocable letter of credit for larger values. After a running history with clean inspections, we move to net terms with credit insurance, and repeat orders ship against your part number with the same document pack every time.
Send your drawing — Sinbo Precision will review material, tolerance scheme and batch plan and return a quotation within 48 hours. Samples in 7–15 days.
Get a Quote in 48 Hours